1. The buyer shall introduce the site especially may affect the installation factors before start.
2. All mechanical and electrical shall be installed by us, including cable.The controller power shall be accessed by the buyer or assisted by us (The material cost shall responsible for the buyer).
3. The cable suit provided by Dawangfans shall meet the standards, with wire pipe (galvanized pipe) installation. The distance between fan and controller shall not exceed 98ft .
4. Dawangfans shall arrive the site on time and complete the installation within specified time.
5. Dawangfans shall clean the site after installation finished.
6. The buyer shall offer relevant personnel and conditions(space, build aerial platform etc) if necessary.







D.FANS / W.FANS
Specification
Mounting Heights

Distance to floor

Mounting column distance

24FT
≤39ft
19'-26'
≥25'3''
20FT
≤52ft
≤39'4''
≥21'7''
16FT
≤59ft
≤49'2''
≥17'7''
12FT-08FT
≤26ft
≤23'
≥9'2''-15'.74''
Structure
Install dimension
Load weight
Torque
I Beam
7.87''-16.5''
≥330Ibs
≥300Nm
Concrete
7.87''-16.5''
Round pipe
≥16.5''
Grid
National standard
Square pipe
≥16.5''
Crane
Distance from crane to blade shall not less than 4.3ft